XiNBEi LIGHTING
16 inch Drum Brass Semi Flush Mount Ceiling Light for Bedroom XB-SF1289-WBS
16 inch Drum Brass Semi Flush Mount Ceiling Light for Bedroom XB-SF1289-WBS
Couldn't load pickup availability
Share
About this item
- 【ELEGANT WARM AMBIANCE】 Brass semi flush mount ceiling light with a classic 2-tier white dual fabric drum shade and frosted glass diffuser. Crafted with a premium brushed brass finish, this 3-light close to ceiling light fixture softly filters glare to emit a soothing glow, effortlessly creating a warm, cozy, and romantic atmosphere for your space.
- 【MODERN TRANSITIONAL DESIGN】 Versatile 16-inch modern drum light fixture featuring smooth architectural lines that seamlessly complement modern, transitional, or farmhouse decor. Perfectly proportioned for low-to-medium-to-high ceilings, it elevates your hallway, entryway, foyer, bedroom, living room, dining room, or kitchen with timeless visual appeal.
- 【CUSTOMIZABLE ILLUMINATION】 3-light E26 medium base socket supports up to 60W bulbs (compatible with LED, CFL, and incandescent). This dimmable hallway lighting fixture allows full brightness control when paired with dimmable bulbs and a compatible dimmer switch, letting you effortlessly tailor the lighting from bright task illumination to soft evening relaxation. (Dimmable Bulb & Switch are not included)
- 【EASY INSTALLATION & MAINTENANCE】 Semi flush mount ceiling light comes complete with all essential mounting hardware and step-by-step instructions for quick, hassle-free hardwired setup. The bottom frosted glass diffuser is easily removable, allowing simple bulb replacement and fixture cleaning without needing to dismantle the whole frame.
- 【ETL CERTIFIED & DEDICATED SUPPORT】 Built with durable iron hardware for sturdy structure and safety. ETL listed for North American safety standards, giving you total peace of mind. Should you need any replacement accessories, glass parts, or installation guidance, our customer support team is available to assist you promptly.
Modern Design for Living Space

With a dual shade design, this semi flush mount ceiling light is a distinctive choice for indoor home lighting.
Glow Defined by Design

With a dual shade design, this 2 light semi flush mount ceiling light is a distinctive choice for indoor home lighting.
Warm Radiance Meets Modern Form

3 light semi flush drum light with smooth line of modern styled lights which blend in with your room theme adding a warming visual appeal that only these lights can create.
Crafted for Life: A Modern Classic

This semi flush light is suggest to use “A” Type Max. 3x60W bulbs for medium base (E26 socket) (incandescent bulb or equivalent CFL / LED bulbs)
The fixture is dimmable when using the dimmable bulb with compatible dimmer switch.
Bulb & Switch not Included.
Product Details
Drum Fabric Shade
2-layer fabric drum shade, the bedroom lights for ceiling is easy to blend in any decor with the beige smooth shade.
Glass diffuser should be secured by finial and cover the support point (3pcs) of fabric shade.
Glass Diffuser VS Acrylic Diffuser
Semi flush light with glass diffuser is easy-clean, stays warp-free, emits soft, gentle glow for a perfect ambiance.
Made for Every Space

This drum semi flush light is perfectly suitable for kitchen, entry, foyer, hallway, corridor, bedroom, or dining room and so on.
It is ideal for medium-high or low ceilings.
Easy to install.

It was just what I’ve been searching for! The glass bottom is perfect.
I originally bought this light for my small living room and loved it so much that I purchased a second one for my office. For the price, it looks surprisingly elegant. It's lightweight when you handle it, but once installed you would never know-and no one is going around feeling your ceiling fixture!
I have it installed on an 8-foot ceiling, and the size is perfect. It adds just enough visual interest to the room without hanging too low or feeling like "too much" for a smaller space. Installation was also very easy.
One thing I wish I had known before installing it is to pay attention to the seam on the shade. Like most lampshades, there is a visible seam, and the position of the mounting bracket determines where that seam ends up. Before tightening everything down, attach or hold up the shade and make sure the seam will face a wall or another less-visible area of the room.
Overall, I'm extremely happy with these fixtures. They're affordable, attractive, easy to install, and look more expensive than they are. I've already bought two and would happily buy a third.
Super cute hallway and laundry room lights! Easy to install!
This light has exceeded my expectations! It��s VERY nice quality, came perfectly packaged, easy to install. Looks great! Super pleased!!