Skip to product information
1 of 8

XiNBEi LIGHTING

Set of 2 Brass Wall Sconces with Fabric Shade for Bedroom & Living Room XB-W1307-WBS

Set of 2 Brass Wall Sconces with Fabric Shade for Bedroom & Living Room XB-W1307-WBS

Regular price $85.99 USD
Regular price Sale price $85.99 USD
Sale Sold out
Shipping calculated at checkout.
View full details

About this item

  • MODERN DESIGN: Hardwired brass wall sconce balances clean industrial lines with traditional charm to create a beautifully balanced lighting source. The elegant brushed brass lamp body arm can support a range of transitional and modern white fabric shade that emits soft light, creating a warm atmosphere for your room. Wall sconce light fixture can be used in various indoor occasions to decorate your home.
  • FEATURE: Indoor Wall lights features a square brushed brass finished back plate, a flared shape white fabric shade,a straight long arm and a decor knob at the bottom. The flared white fabric shade gives you a comfy feeling with its soft light and perfect for lighting general areas. This fabric wall lamps is set of 2 just and mounted vertical only.
  • E12 BASE SOCKET: This gold sconces wall lighting suggest to takes one maximum 40 watt E12 base bulbs (incandescent, CFL or LED compatible). Bulbs not included.
  • EASY INSTALLATION: Hardwired. Mid centery modern sconces wall decor set of 2 come with mounting hardware accessories and instruction for quick and easy installation.
  • ETL LISTED. For any question on any replacement accessory, just feel free to contact us.



    Solid Brass Wall Lamp: Timeless Warmth for Modern Walls

This hardwired wall lamp with durable metal long lamp body in brushed brass finish and white fabric shade can perfectly match your home style.

Ambient Light for Living Space

 

Brass sconces wall lighting features elegant long column stand arm and flared white fabric shade, blends with many decor styles and completely transform your space!

Modern gold wall light can be used as a living room wall lamp, doorway wall sconce, bathroom vanity light fixture.

Easy to install.

Soft, Even Glow from a White Fabric

White Fabric Shade

  • Decorative wall lamp with White fabric shade.
  • A fabric empire shade caps this bathroom sconce light and diffuses the light throughout your bedroom, living room, dining room, or powder room.

Compatible with Variety of Bulbs

  • This bedside wall lamp is suggest to use “C” Type Max. 1x40W bulbs for E12 base (incandescent bulb or equivalent LED bulbs)
  • The fixture is dimmable when using the dimmable bulb with compatible dimmer switch.
  • Bulb not Included.

Certificated Product

  • Our wall lamp with ETL-certified is in reliable performance and long-lasting durability.

ETL Listed

  • Total Quality. Assured. You will be amazed what you find at XiNBEi Lighting.
↑ Back to Top